ARTIFICIAL LIFT SYSTEMS
Discipline: Reservoir, Completion, Production and Facilities engineering
Level: Basic/Intermediate
Duration: 5 days
Instructor: Jairo Balcacer
Purpose
Learn conditions to be considered in the selection of the optimum artificial lift system that ideally will give the highest present value for the life of the project. Learn details around the major artificial lift systems components as well as their benefits and disadvantages, as well as monitoring systems leading to optimize the system performance
Designed
Designed for:
This course is focused to instruct any team member involved in the production operations, as well as part of the well performance optimization process, the basic considerations to select the required artificial list system and their operating conditions, maintenance and troubleshooting.
You will learn
- General considerations during the artificial lift system selection
- Details on Gas lift, Electro Submersible Pump, Reciprocating Rod pump, Progressive Cavity Pump, Hydraulic Pump and Plunger Lift systems
- Outline details involved in the design of each system
- The basic operating principles
- The tools and methods used to monitor and optimize the system performance
Content
Selecting and Artificial lift System
- Initial screening criteria
- Economics of artificial lift
- Artificial lift in horizontal and options
- Artificial lift applications summary
Gas Lift
- Gas Lift applications
- Downhole installations
- Gas lift valves and mechanics
- Continuous gas lift
- Intermittent gas lift
- Aspects of well unloading and operation
- Gas lift surface facilities
Electro Submersible Pump
- ESP system overview
- ESP power components
- ESP operating principles
- ESP system design
- ESP system operation
Reciprocating Rod Pump System
- Rod Pumping overview
- Surface equipment
- Subsurface equipment
- Rod string system
- API system design procedure
- Pumping Unit design procedure – Rod Analysis
- Polished rod dynamometers
- Rod load vs Displacement
- System monitoring Dynagraphics
Hydraulic Pump System
- Subsurface hydraulic pumps
- Downhole installations
- Surface facilities
- Reciprocating pumps, System design
- Reciprocating pumps, conditions
- Jet Pumps: design and operation
Progressive Cavity Pumps
- PCP system components
- PCP system applications
- PCP system design and installations
- PCP operation
Plunger Lift System
- Plunger lift overview
- Plunger lift design and installations
Software applications:
- MS Excel spreadsheets
- Prosper
Text and Consulting books:
- “Petroleum Engineering Handbook, Larry W. Lake, Volume IV, Production Operations Engineering, Society of Petroleum Engineers
- “Petroleum Production Systems”; M. J. Economides, et al, Prentice Hall Petroleum Engineering Series
Discipline: Reservoir, Completion, Production and Facilities engineering
Level: Basic/Intermediate
Duration: 5 days
Instructor: Jairo Balcacer